[1]
2020. On the equivalence of the forecast value construction in the “pyramidal” extrapolation method and cubic forecast. MCIT: Proceedings of International scientific and practical conference. 4 (Oct. 2020), 67–70. DOI:https://doi.org/10.31713/MCIT.2020.15.