On the equivalence of the forecast value construction in the “pyramidal” extrapolation method and cubic forecast
DOI:
https://doi.org/10.31713/MCIT.2020.15Keywords:
extrapolation; forecast; divided differences; interpolation, time series recognition problemsAbstract
The paper is devoted to the new method of short time series extrapolation, which was developed in recent years and was called “pyramidal”. This method can be used for predicting the deterministic component of an arbitrary economic, environmental and geophysical parameters. Numerical results show significant advantages of the proposed method in comparison with approaches to extrapolate, based on the use of polynomials, including Newton’s extrapolation . In this paper we study the procedure for constructing the forecast value in accordance with the pyramidal method and show that it is equivalent to the cubic forecast.
References
Downloads
Published
2020-10-23
Issue
Section
Mathematical, computer modeling and computational methods
How to Cite
On the equivalence of the forecast value construction in the “pyramidal” extrapolation method and cubic forecast. (2020). MCIT: Proceedings of International Scientific and Practical Conference, 4, 67-70. https://doi.org/10.31713/MCIT.2020.15